<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Project results</title>
<link>https://www.darianco.ir/en</link>
<description></description>
<pubDate>Fri, 29 May 2026 22:51:51 GMT</pubDate>
<lastBuildDate>Fri, 29 May 2026 22:51:51 GMT</lastBuildDate>
<item>
<title>Project 84</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/84</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">84</guid>
<description>Renovation of 6.6 KV switchgears of Ehya II&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Khuzestan Steel Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/84/IMG_20231129_083111_681.jpg&#39;&gt;IMG_20231129_083111_681&lt;/a&gt;&lt;BR&gt;2024&lt;BR&gt;&lt;b&gt;Project End Date&lt;/b&gt;:&amp;nbsp;In progress&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/84/IMG_20231129_083139_184.jpg&#39;&gt;IMG_20231129_083139_184&lt;/a&gt;&lt;BR&gt;All the implementation operations of this project will be carried out in Khuzestan Steel Company, located at 10 kilometers southeast of Ahvaz city at 31o, 20&#39; N, 48o, 40&#39; E latitude and longitude. The height above sea level is about 12.5 meters.&lt;br /&gt;Ahvaz plain consists of alluvial sediments of the present era, which is the result of the destruction of the Zagros highlands and their transport and deposition by surface waters. These sediments are mostly composed of sand, silica and clay, which is about 200 meters thick.&lt;br /&gt;A very important point is the existence of an underground aqufier, the level of which is about 1.5 meters below the surface of the ground, and it should be taken into account in the calculations and design of operational activities such as excavation and foundation implementation wherever necessary.&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 06:50:00 GMT</pubDate>
</item><item>
<title>Project 85</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/85</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">85</guid>
<description>high pressure lines to supply electricity to oil wells in Cheshmekhosh, Dalperi&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;ZN VOSTOK&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/85/CK03 and CK22 Sub pack transfer-2.jpg&#39;&gt;CK03 and CK22 Sub pack transfer-2&lt;/a&gt;&lt;BR&gt;2022&lt;BR&gt;&lt;b&gt;Project End Date&lt;/b&gt;:&amp;nbsp;In progress&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/85/CK12-subpack maintenance and backfill work-2.jpg&#39;&gt;CK12-subpack maintenance and backfill work-2&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/85/Pole No 124-125 disconnector.jpg&#39;&gt;Pole No 124-125 disconnector&lt;/a&gt;&lt;BR&gt;Engineering services, supply and implementation of high pressure lines to supply electricity to oil wells in Cheshmekhosh, Dalperi, and East Paydar regions&lt;br /&gt;Cheshmehkhosh oil field is located in Dasht-e Abbas region of Ilam province, at a distance of 52 km from the south of Dehloran city and 70 km west of Andimeshek city. This oil field, with an average daily production capacity of crude oil for 18 thousand barrels and an average daily production capacity of natural gas for 115 million cubic feet, was discovered in 1964 and exploited in 1976.&lt;br /&gt;The oil produced in this field is transferred to the Ahvaz 3 exploitation complex through a 153 km pipeline and finally sent to Kharg Island through the oil terminal in order to supply and feed the refineries or export. Cheshmehkhosh oil field is one of the fields under the management of Iranian Central Oil Fields Company.&lt;br /&gt;The main goal of the mentioned project is the design, supply and implementation of engineering services for the provision of electricity to the oil wells in the Cheshmehkhosh area through the 230kV/33kV transmission substation of Shahaday-e Moharram (Bohamid).&lt;br /&gt;Description of services requested by the employer in this project:&lt;br /&gt;1- Engineering design services for mast and concrete beam transmission lines, 33 KV feeders in of Shahaday-e Moharram substation, electrification to oil wells, ground system, lighting, protection design, to design the metering system, etc.&lt;br /&gt;2- Supply of equipment including high pressure masts, concrete beam, high pressure conductor, lighting equipment, substation’s ground system, 33 kV feeders, power cables, metering and control systems, control cables, package posts (33kV/0.4kV)&lt;br /&gt;3- Execution of mast and reinforced concrete lines, installation and commissioning of 33 kV feeders in 230kV/33/kV substation, implementation of ground system, cabling, installation and commissioning of metering system, implementation of lighting system,&lt;br /&gt;4- Testing, setting up and commissioning of transmission lines, package substations, 33 kV feeders, and ...&lt;br /&gt;&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 07:23:00 GMT</pubDate>
</item><item>
<title>Project 86</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/86</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">86</guid>
<description>6.6 kV switchboards of steam unit one of Tabriz Thermal Power Plant&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;East Azerbaijan Electricity Production Management Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/86/20220105_084749.jpg&#39;&gt;20220105_084749&lt;/a&gt;&lt;BR&gt;2019&lt;BR&gt;&lt;b&gt;Project End Date&lt;/b&gt;:&amp;nbsp;2021&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/86/20220105_084805.jpg&#39;&gt;20220105_084805&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/86/20220105_084921.jpg&#39;&gt;20220105_084921&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/86/20221019_103616.jpg&#39;&gt;20221019_103616&lt;/a&gt;&lt;BR&gt;Construction, installation and commissioning of 6.6 kV switchboards of steam unit one of Tabriz Thermal Power Plant &lt;br /&gt;The construction operation, in short, the purchase and supply of 25 switchboards of 6.6 KV for steam unit one of Tabriz power plant as mono block of Unisafe plan of ABB company has been completed.&lt;br /&gt;In addition, the following have been done in the installation and commissioning operation briefly:&lt;br /&gt;Dismantling and removing the existing panels, construction of the old switchgear hall, power cable splicing, installing new panels, performing all cable laying operations, setting protective relays, carrying out circuit performance accuracy tests, etc.&lt;br /&gt;Finally, the project has been electrified and delivered to the client after testing and inspecting the boards and its tools.&lt;br /&gt;&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 07:42:00 GMT</pubDate>
</item><item>
<title>Project 87</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/87</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">87</guid>
<description>Construction of central sub-station of K electricity of Tehran Oil Refinery &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Iranol Oil Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/87/7.jpg&#39;&gt;7&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/87/1.jpg&#39;&gt;1&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/87/2.jpg&#39;&gt;2&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/87/6.jpg&#39;&gt;6&lt;/a&gt;&lt;BR&gt;Construction of central sub-station of K electricity of Tehran Oil Refinery (Iranol)&lt;br /&gt;According to the current situation of Tehran Refinery of Iranol Oil Company and due to the wear and tear of electrical panels, transformers, and sbstation K, Iranol Oil Company intends to renovate this complex. The renovation operation of the K substation includes the supply, installation and operation of a medium pressure switchgear set with a voltage level of 6.3 KV, construction of an explosion-proof building and moving the pipe rack column from the construction site to outside of it without disruption.&lt;br /&gt;In addition, a transformer device with a capacity of 1000 KVA with a voltage level of 0.4/6.3 KV along with low pressure switches will be replaced with a transformer with a capacity of 1600 KVA with a voltage level of 0.4/6.3 KV and its accessories such as bus duct and MCC low pressure switch. The strategic location of this project and the need to update the old system is very important, and this project is completely excavated manually due to the large volume of underground cables in the building construction section, and has limitations such as cable containment and moving the old pipe rack columns without interference of the current system. Moreover, due to the special situation of not being able to stop the production, the issuance of blackout permits is performed by special restrictions and due to the electrical situation, the project has special challenges.&lt;br /&gt;&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 07:58:00 GMT</pubDate>
</item><item>
<title>Project 88</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/88</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">88</guid>
<description>Installation of power supply for soil replacement and water disposal works &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Atom stroyexport&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/88/8be91d05131d0f24837c1bbbb32abd82.jpg&#39;&gt;8be91d05131d0f24837c1bbbb32abd82&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/88/fe134d05486a08d83910909c2e218e3b.jpg&#39;&gt;fe134d05486a08d83910909c2e218e3b&lt;/a&gt;&lt;BR&gt;Installation of power supply for soil replacement and water disposal works at the industrial site of Ek-TB0002 - Temporary lighting networks for technical construction and installation works in the first stage of concreting EN.TB0001 - Temporary power supply networks for construction and installation operations ET.TB0001 - Electricity supply system for soil replacement activities and water removal at the production site of EK.TB0002 - Temporary lighting networks for the construction and assembly of work in the first stage of concreting of EN.TB0001 - Temporary power supply networks for the construction and assembly of work in the first stage of concreting and paintings of ET TB0001&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 08:05:00 GMT</pubDate>
</item><item>
<title>Project 89</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/89</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">89</guid>
<description>supply electricity to slag flotation plant in Sarcheshmeh copper complex &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Iran National Copper Industry Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/89/2.JPG&#39;&gt;2&lt;/a&gt;&lt;BR&gt;2021&lt;BR&gt;&lt;b&gt;Project End Date&lt;/b&gt;:&amp;nbsp;In progress&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/89/image(2).jpeg&#39;&gt;image(2)&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/89/image(28).jpg&#39;&gt;image(28)&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/89/image(32).jpeg&#39;&gt;image(32)&lt;/a&gt;&lt;BR&gt;Engineering services, supply and implementation of high pressure lines to supply electricity to oil wells in Cheshmekhosh, Dalperi, and East Paydar regions&lt;br /&gt;The construction, in short, the purchase and supply of 25 switchboards of 6.6 KV for one steam unit of Tabriz power plant has been completed as mono block, unisafe design of ABB company.&lt;br /&gt;In addition, the following items, in short, have been done in the installation operation:&lt;br /&gt;Dismantling and removing the existing panels, performing construction operations in the old switchgear hall, jointing of power cables, installing new panels, performing all cable laying operations, setting protective relays, performing tests for circuit performance accuracy, etc.&lt;br /&gt;Finally, after testing and inspecting the panels and its accessories, the process has been electrified and delivered to the Employer.&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 08:08:00 GMT</pubDate>
</item><item>
<title>Project 90</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/90</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">90</guid>
<description>The 132/11 kv Substation of Rag-e Sefid, and the 132 kV two-circuit line&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Persian Gulf Bidboland Gas Refining Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/90/Picture3.jpg&#39;&gt;Picture3&lt;/a&gt;&lt;BR&gt;2021&lt;BR&gt;&lt;b&gt;Project End Date&lt;/b&gt;:&amp;nbsp;In progress&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/90/Picture4.jpg&#39;&gt;Picture4&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/90/Untitled-2.jpg&#39;&gt;Untitled-2&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/90/Picture5.jpg&#39;&gt;Picture5&lt;/a&gt;&lt;BR&gt;The 132/11 kV Substation of Rag-e Sefid, and the 132 kV two-circuit line, between the Isar 400/132 kV substation and Rag-e Sefid substation&lt;br /&gt;&lt;br /&gt;In this project, Darian company is the contractor for reviewing and validating the basic design and performing all detailed designs, purchasing and supplying equipment needed for the packaging project, loading land and sea transportation, customs affairs and insurance clearance, and carrying out all construction, architectural, mechanical, installation, testing and commissioning works, delivery and guarantee during the warranty period and compliance with all safety, health, environmental issues, and supply of spare parts as EPCC for the construction of the 132/11 kV Substation of Rag-e Sefid and the construction of a 132 kV two-circuit line (three conductors in each phase), between the Isar 400/132 kV substation and Rag-e Sefid substation for 38 km.&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 08:40:00 GMT</pubDate>
</item><item>
<title>Project 91</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/91</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">91</guid>
<description>Iranian Central Oilfields Company&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Farab Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/91/20200821_110805.jpg&#39;&gt;20200821_110805&lt;/a&gt;&lt;BR&gt;2020&lt;BR&gt;&lt;b&gt;Project End Date&lt;/b&gt;:&amp;nbsp;2021&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/91/20200820_083616.jpg&#39;&gt;20200820_083616&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/91/20200918_053200.jpg&#39;&gt;20200918_053200&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/91/20200820_083553.jpg&#39;&gt;20200820_083553&lt;/a&gt;&lt;BR&gt;Complete implementation of two metro stations as EPC in Hashtgerd, which includes design review, engineering the switch yard construction works and necessary calculations based on technical specifications, preparation of technical documents and instructions for installation, testing and commissioning, as well as supply of required materials and equipment, procurement of necessities , manufacturing, testing in the manufacturer&#39;s factory, performing functional tests, packaging for export, abroad transportation (sea, land or air), obtaining the entry permit for importing goods and clearance and performing customs duties, loading, and unloading, transportation and insurance for inland transportation of materials and equipment from the contractor&#39;s workshop to the site, site equipment, storage and storeroom, moving equipment and materials in the site (transportation from the warehouse to the installation site), running and setting up the technical office, necessary protection, workshop assembly, installation and preparation of surface, painting, insulation, workshop tests, performing pre-commissioning operations, monitoring and commissioning, correcting defective or incomplete works, project management as well as provisional acceptance, fixing defects in warranty periods and trial operation, final acceptance, supply of spare parts for 5 years, providing and delivery of drawings and technical documents.&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 09:03:00 GMT</pubDate>
</item><item>
<title>Project 92</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/92</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">92</guid>
<description>South pars&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;South Pars Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/92/DSC00478.JPG&#39;&gt;DSC00478&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/92/DSC_0238.jpg&#39;&gt;DSC_0238&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/92/DSC00486.JPG&#39;&gt;DSC00486&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/92/DSC09974.jpg&#39;&gt;DSC09974&lt;/a&gt;&lt;BR&gt;Design, procurement, installation  operation, test and commission, MV electrical supply to phases 22-24 residential camp of south pars&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 09:10:00 GMT</pubDate>
</item><item>
<title>Project 95</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/95</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">95</guid>
<description>Tabas Substation &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Yazd Regional Electric Company&lt;BR&gt;Design, procurement of 132/20KV Tabas Substation &lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 09:19:00 GMT</pubDate>
</item><item>
<title>Project 93</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/93</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">93</guid>
<description>230KV Ahvaz No3&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Khuzestan Regional Electric Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/93/DSC02066.JPG&#39;&gt;DSC02066&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/93/20131112_141044.jpg&#39;&gt;20131112_141044&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/93/20131112_141017.jpg&#39;&gt;20131112_141017&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/93/DSC02065.JPG&#39;&gt;DSC02065&lt;/a&gt;&lt;BR&gt;Design, procurement, installation  operation, test and commission of  two  132/33 KV Substations at Khuzestan province and extension of 230KV Ahvaz No3 Substation&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 09:20:00 GMT</pubDate>
</item><item>
<title>Project 94</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/94</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">94</guid>
<description>Bibi Hakimeh 33KV&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;National Iranian South Oilfield Company&lt;BR&gt;&lt;b&gt;Project Image&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/94/02012013618.jpg&#39;&gt;02012013618&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 2&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/94/02012013626.jpg&#39;&gt;02012013626&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 3&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/94/29122012565.jpg&#39;&gt;29122012565&lt;/a&gt;&lt;BR&gt;&lt;b&gt;Project Image 4&lt;/b&gt;:&amp;nbsp;&lt;a href=&#39;/Portals/2/PropertyAgent/496/Files/94/29122012570.jpg&#39;&gt;29122012570&lt;/a&gt;&lt;BR&gt;procurement, installation  operation, test and commission of Bibi Hakimeh 33KV transmission line&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 09:28:00 GMT</pubDate>
</item><item>
<title>Project 96</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/96</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">96</guid>
<description>Bafgh &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Yazd Regional Electric Company&lt;BR&gt;Design, procurement, installation operation, test and commission of two 63KV feeders at 132/20 KV Bafgh substation in order to Extension&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:02:00 GMT</pubDate>
</item><item>
<title>Project 97</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/97</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">97</guid>
<description>electrical equipment for electrical distribution  Network supply &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;TAM Iran Khodro&lt;BR&gt;procurement, installation  operation, test and commission of electrical equipment for electrical distribution  Network supply in saloon5  &lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:03:00 GMT</pubDate>
</item><item>
<title>Project 98</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/98</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">98</guid>
<description>electrical equipment power Network supply&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;TAM Iran Khodro&lt;BR&gt;procurement, installation  operation, test and commission of electrical equipment power Network supply in saloon2 (Peugeot L-90)&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:05:00 GMT</pubDate>
</item><item>
<title>Project 99</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/99</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">99</guid>
<description>Salehe Abad Substation&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Bakhtar Regional Electric Company&lt;BR&gt;Design, procurement, installation operations, tests and commission of equipment for Extension of 230/63/20KV Salehe Abad Substation&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:05:00 GMT</pubDate>
</item><item>
<title>Project 100</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/100</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">100</guid>
<description>Khuzestan Regional Electric Company&lt;BR&gt;Design, procurement, installation  operation, test and commission of four  132/33 KV Substation at Khuzestan province&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:06:00 GMT</pubDate>
</item><item>
<title>Project 101</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/101</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">101</guid>
<description>20KV Capacitor Bank&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Fars Regional Electric Company&lt;BR&gt;Design, procurement, installation of 20KV Capacitor Bank for 66KV Substation &lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:29:00 GMT</pubDate>
</item><item>
<title>Project 102</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/102</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">102</guid>
<description>Fars Regional Electric Company&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Fars Regional Electric Company&lt;BR&gt;Design and Engineering of  power supply in one of the Fars areas&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:31:00 GMT</pubDate>
</item><item>
<title>Project 103</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/103</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">103</guid>
<description>Rafsanjan2 230/132/20 KV and  Ahmad – Abad substations&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Kerman Regional Electric Company&lt;BR&gt;Design, procurement, installation  operation, test and commission of Rafsanjan2 230/132/20 KV and  Ahmad – Abad substations&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:32:00 GMT</pubDate>
</item><item>
<title>Project 104</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/104</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">104</guid>
<description>electrical equipment for electrical distribution system NP&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;TAM Iran Khodro&lt;BR&gt;procurement, installation  operation, test and commission of electrical equipment for electrical distribution system NP Gallery  &lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:33:00 GMT</pubDate>
</item><item>
<title>Project 105</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/105</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">105</guid>
<description>Rain and  Rustam – Abad substations&lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;Kerman Regional Electric Company&lt;BR&gt;Design, procurement, installation  operation, test and commission of 132/20 KV Rain and  Rustam – Abad substations&lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:34:00 GMT</pubDate>
</item><item>
<title>Project 106</title>
<link>https://www.darianco.ir/en/Projects/agentType/View/PropertyID/106</link>
<dc:creator>کوثر محمدی</dc:creator>
<guid isPermaLink="false">106</guid>
<description>electrical equipment for Power Network supply &lt;BR&gt;&lt;b&gt;Employer name&lt;/b&gt;:&amp;nbsp;TAM Iran Khodro&lt;BR&gt;procurement, installation  operation, test and commission of electrical equipment for Power Network supply in Peugeot saloon (Peugeot 450) &lt;br /&gt;&lt;BR&gt;</description>
<pubDate>Sun, 20 Sep 2020 10:34:00 GMT</pubDate>
</item>
</channel>
</rss>
