6.6 kV switchboards of steam unit one of Tabriz Thermal Power Plant

Project type: EPC

Construction, installation and commissioning of 6.6 kV switchboards of steam unit one of Tabriz Thermal Power Plant
The construction operation, in short, the purchase and supply of 25 switchboards of 6.6 KV for steam unit one of Tabriz power plant as mono block of Unisafe plan of ABB company has been completed.
In addition, the following have been done in the installation and commissioning operation briefly:
Dismantling and removing the existing panels, construction of the old switchgear hall, power cable splicing, installing new panels, performing all cable laying operations, setting protective relays, carrying out circuit performance accuracy tests, etc.
Finally, the project has been electrified and delivered to the client after testing and inspecting the boards and its tools.

Eployer :

East Azerbaijan Electricity Production Management Company

Start | End :

2019 | 2021